Rocket Pool Trading Discord Summary
📅 Jan 24, 2026 (855 Total Messages)
Channel: #📈︱trading — Source: Rocket Pool Discord

🌐 Core Topics Concise overview of the main themes discussed.

Hover over Icons to pause the carousel and view extended explanation!

  • 🪐
    Saturn 1 Validator Economics
    Discussion of how Saturn 1 changes validator requirements.
  • 🧵
    Scam Threads and User Impersonation
    Coordinated scam threads impersonating trusted users raise alarm.
  • 🧠
    Smart Node Forced Exits
    Debate over allowing Smart Node to trigger validator exits.
  • 🗳️
    Delegate Upgrades Versus Node Autonomy
    Whether node operators should be able to opt out of delegate upgrades.

👥 Key Participants

Key community members driving the discussion.

haloooloolo

haloooloolo

rocket-scientist

Member SinceNov 4, 2024
Voting Power1.3k
pDAO Votes18
Forum Views1085
Forum Likes109
Speed78

AbilityIMC

Hidden AbilityDev Enthusiast

sckuzzle

sckuzzle

gmc

Member SinceNov 28, 2016
Voting Power408
pDAO Votes24
Forum Views955
Forum Likes48
Speed83

AbilityIMC

Hidden Ability

knoshua

knoshua

node-operator

Member SinceMay 6, 2020
Voting PowerUnknown
pDAO VotesUnknown
Forum Views1835
Forum Likes498
Speed100

Ability

Hidden AbilityDev Enthusiast

valdorff

valdorff

rocket-scientist

Member SinceApr 17, 2024
Voting Power1k
pDAO Votes60
Forum Views3988
Forum Likes1.2k
Speed110

AbilityIMC

Hidden AbilityRPIP Editors

drdoofus

drdoofus

gmc

Member SinceDec 17, 2024
Voting PowerUnknown
pDAO VotesUnknown
Forum Views2309
Forum Likes256
Speed60

AbilityTweets

Hidden AbilityStore Merch

jasper.the.friendly.ghost

jasper.the.friendly.ghost

community-advocate

Member SinceFeb 4, 2021
Voting PowerUnknown
pDAO VotesUnknown
Forum Views1378
Forum Likes191
Speed90

AbilityIMC, Tweets

Hidden AbilityBeta Tester

orangesamus

orangesamus

node-operator

Member SinceJul 10, 2022
Voting Power1k
pDAO Votes17
Forum Views1691
Forum Likes145
Speed79

AbilityIMC

Hidden Ability

ethereanbull

ethereanbull

node-operator

Member SinceMar 7, 2021
Voting PowerUnknown
pDAO VotesUnknown
Forum Views558
Forum Likes2
Speed120

Ability

Hidden Ability

kpk

kpk

node-operator

Member SinceJul 6, 2022
Voting PowerUnknown
pDAO VotesUnknown
Forum ViewsUnknown
Forum LikesUnknown
Speed102

Ability

Hidden Ability

drdoofus0000

drdoofus0000

gmc

Member SinceDec 17, 2024
Voting PowerUnknown
pDAO VotesUnknown
Forum Views2309
Forum Likes256
Speed60

AbilityTweets

Hidden AbilityStore Merch

🧠 Discussion Highlights Notable moments and direct quotes from Trading.

Click the icon to open Discord at the quoted message

  • 🪐
    Saturn 1 Impact
    Explanation of how Saturn 1 increases rETH requirements and limits validator creation.
    So we're going to reduce the number of validators we can create while we are rETH limited — sckuzzle [[1/23/2026 10:35 PM]]
  • Long-Term Survival
    Reflection on whether Rocket Pool or even Ethereum will exist decades from now.
    I'd give Ethereum existing in a meaningful form in 50 years less than a 50% chance — haloooloolo [[1/23/2026 11:23 PM]]
  • ⚖️
    Authority Ambiguity
    Attempt to neutrally frame the division of power between DAO and Labs.
    Seems like Dave is saying the DAO owns contracts and has control over settings but labs still manages the smart node — orangesamus [[1/24/2026 12:17 AM]]
  • 🔓
    Node Operator Trust
    Rebuttal that the protocol already requires significant trust.
    I think the benefit is quite large in respecting node autonomy / trustlessness as a principle — jasper.the.friendly.ghost [[1/24/2026 12:31 AM]]
  • 🧱
    Trust Assumptions
    Rebuttal that the protocol already requires significant trust.
    the protocol is not trustless in many areas and it would take a lot of work to get there — haloooloolo [[1/24/2026 12:31 AM]]
  • 🏗️
    Minipools Sunset
    Recognition that minipools are being phased out in favor of megapools.
    Minipools are on the way out. Working hard to support them seems wasted effort. — valdorff [[1/24/2026 12:34 AM]]
  • 📈
    Megapool Limits
    Practical concern about how far the new megapool model can realistically scale.
    does this mean we can create only about 350 megapools? — kpk0773 [[1/24/2026 7:50 PM]]
  • 🏁
    Vote Acceleration
    Celebratory framing as the vote approaches a decisive outcome.
    if people don't override their delegates to vote against, we are on our way to the promised land! — drdoofus0000 [[1/24/2026 9:46 PM]]

📊 Snapshot Market Data Jan 24th:

Cited data during Jan 24, 2026. Percentage change from previous day.

  • RPL/ETH: 0.0006857324 (+1.03%)
  • RPL/USD: $2.036 (+2.11%)
  • ETH/USD: $2,969.05 (+1.05%)
  • rETH/ETH: 1.15614 (+0.01%)
  • Smoothing Pool Balance: 7.0020 ETH (0.00%)
  • TIBBIR: $0.1706 (+14.41%)
  • Staking Pool Balance: 10344.79 ETH (+9.64%)
  • Checkpoint: In 18 days

DETAILED SUMMARY: Rocket Pool Community Call - Saturn 1 Upgrade

Posted By: Ken

DETAILED SUMMARY: Rocket Pool Community Call - Saturn 1 Upgrade
==============================================================================

MEETING OVERVIEW
----------------
This is a Rocket Pool community call focused on the upcoming Saturn 1 upgrade,
the protocol's biggest release since mainnet launch. The call features Langers
(from the Rocket Pool team), Mav (marketing), and Ken (community moderator),
along with community members.

DATE CONTEXT: Mid-January 2026, approximately 4 weeks before Saturn 1 launch.

==============================================================================
KEY TOPICS DISCUSSED
==============================================================================

1. SATURN 1 LAUNCH DATE
-----------------------
- Original target: February 9th
- NEW TARGET: February 16th, 2026
- Reason for delay: A rewards interval occurs 4 days after Feb 9th, which
  would require a V11 (new reward tree spec) submission with insufficient
  testing time. Moving to Feb 16th provides a full 4-week buffer for testing.

2. AUDIT STATUS
---------------
Three security audits were conducted:
- CANTINA: Report published (available on website)
- BALSEC: Nearly complete, expected within 1-2 days. Described as "exhaustive"
- SIGMA PRIME: Complete but needs minor report updates (some items still
  marked "open" instead of "resolved")

Key findings:
- Several high-severity issues found (and fixed)
- Many medium-severity issues addressed
- The team and auditors found similar issues independently, increasing confidence
- All critical fixes have been implemented and verified

3. CURRENT PROTOCOL STATE
-------------------------
Mini-Pool Queue:
- Queue is now CLOSED (per snapshot vote)
- Zero mini-pools remaining in queue (cleared as of call date)
- Last mini-pool processed a few days prior

Liquidity Status:
- Withdrawal liquidity buffer: 100% full (~4,000 ETH)
- Deposit pool: ~2,000 ETH available for mega-pools
- rETH discount has returned to zero (on-peg with NAV)

4. MEGA-POOLS vs MINI-POOLS: WHY MIGRATE?
-----------------------------------------
For Node Operators:
- 4 ETH validators (vs 8 ETH) = 2x capital efficiency
- More validators = more chances for MEV, block proposals, sync committees
- Single smart contract for all validators = lower gas costs
- Higher earnings potential overall
- RPL staking enables "voter share" (fee switch rewards)

For rETH Holders:
- Better protocol scalability (no more supply constraints)
- Prioritized withdrawal liquidity
- Better institutional accessibility (direct minting always available)

For RPL Holders:
- Fee switch: 9% of rETH commission flows to RPL-staking node operators
- Inflation reduction: From 5% down to 1.5-2.5% (post-Saturn)
- Direct value accrual tied to protocol TVL

5. MIGRATION CONSIDERATIONS
---------------------------
What happens if node operators DON'T migrate:
- RPL inflation rewards will cease (approximately 4 intervals after Saturn)
- Bonus commission (above 5% base) will end for Saturn-zero nodes
- Mini-pools will continue to function but earn less
- RPL becomes "unproductive" if not migrated

Express Queue Tickets:
- Allocated at Saturn launch for existing node operators
- Prioritizes migrating operators over new entrants
- Game theory: Some may prefer immediate deposit pool access over tickets

6. TESTING & DEPLOYMENT TIMELINE
--------------------------------
- DevNet 6: Currently active on Holesky (internal testing)
- TestNet: Planned deployment mid-to-late next week
- V11 (reward tree spec): Being tested, some challenges with verification
- "Hypercare" period: First 4 weeks post-launch will be intensive monitoring

7. MARKETING CAMPAIGN
---------------------
Joint effort between team and GMC (Grants & Marketing Committee):

Five pillars:
1. Organic content from Rocket Pool channels
2. Community amplification (Purr campaign already started)
3. Ecosystem partner announcements
4. Paid media (Bankless, The Defiant - interviews, articles, guides)
5. Organic PR coverage from news sites

Timeline: Build-up 2 weeks before launch, concentrated activity at/after launch
Focus: rETH holders and RPL holders (not just node operators)

8. ORACLE DAO (oDAO) UPDATE
---------------------------
- EtherScan has departed the oDAO
- Current membership: 11 members (minimum threshold)
- Target: 13 members
- Discussions ongoing with Balsec as potential new member
- Need to update "one-page economics" document for oDAO recruitment

9. FRONT-END & REGULATORY ISSUES
--------------------------------
- Australian regulations restrict what the official front-end can offer
- Cannot directly support wrapped ETH or other token swaps
- CowSwap integration exists for secondary routing
- Team is open to third-party front-ends (like Liquity model)
- Working with Australian Treasury on improved crypto regulations

10. POST-SATURN ROADMAP
-----------------------
Priority features for Saturn 2 (to be kept small for faster release):
1. "Redemption" - rETH ability to force validator exits when withdrawal
   liquidity is insufficient
2. Underperforming node operator exits - ability to remove consistently
   underperforming validators

Additional considerations:
- Smart node improvements (MEV-commit, Vero/Vouch integration)
- Community workshops for prioritization
- RPIP-77: Proposal to auto-upgrade mini-pool delegates via smart node

11. RPIP-77 (Delegate Upgrade Proposal)
---------------------------------------
- Strong community support
- Would set flag to always use latest delegate
- Removes ability to roll back to old delegates
- Enables future forced exit capabilities for underperforming nodes
- Implementation likely post-Saturn due to current capacity constraints

==============================================================================
ACTION ITEMS & NEXT STEPS
==============================================================================

For Node Operators:
- Wait for Saturn launch before exiting mini-pools (to receive express tickets)
- Prepare Holesky testnet validators for practice migration
- Watch for detailed migration article (expected 1-2 weeks before launch)
- Consider migration strategy: immediate vs. gradual

For the Team:
- Finalize Balsec and Sigma Prime audit reports
- Deploy testnet next week
- Publish detailed Saturn article
- Announce official launch date
- Update oDAO economics documentation

For the Community:
- Participate in Purr marketing campaign
- Test on devnet/testnet when available
- Provide feedback on website/front-end improvements
- Vote on RPIP-77 if not already done

==============================================================================
RESOURCES MENTIONED
==============================================================================

- Saturn Explainer: rp-saturn.webflow.io
- RPL Fee Switch Calculator: rpl-fee-switch.streamlit.app
- Website Feedback Thread: Discord governance channel
- Saturn Marketing Thread: Discord trading channel

==============================================================================
SUMMARY
==============================================================================

Saturn 1 represents Rocket Pool's most significant upgrade since launch,
fundamentally changing the protocol's economics and scalability. The launch
has been pushed one week to February 16th to ensure adequate testing time
around the rewards interval. All three security audits are essentially
complete with fixes verified. The protocol is in an optimal state with
cleared queues and full liquidity buffers. Node operators should prepare
for migration but wait until after Saturn launches to exit mini-pools.
Marketing efforts will intensify 2 weeks before launch with focus on
rETH and RPL value propositions rather than technical node operator details.